Specific interventions on rope and nacelle for complete change of the backlighting system of the interior of Grandiose works and inside a Bank reception hall
148m/Gondola/Ropes
40 minutes of climb / Summit at 150m / Visual of 3000m2
External intervention at 80m
Short break « Fruit juice »
Team G.T.M.
Tour Edipresse Lausanne, controls and settings from above
Work with platform and scaffolding
Visual 50m2/removable system